Finally got enough of the basics done to start putting up walls and floor! The walls are about 2/3 up, but enough to get tiled and have the fixtures installed. The floor is ready for tile. I need to paint on the waterproofing membrane, and then tile away! I'd love to finish enough of the tile to have the fixtures installed before vacation, but that might be a little aggressive even for me. If I miss though, at least I'll be in a great spot for when we get back.
From here:
To here (actually a little further than depicted, that wall is covered and the seams have been taped):
No comments:
Post a Comment