Monday, July 8, 2013

Now we're rolling

Finally got enough of the basics done to start putting up walls and floor!  The walls are about 2/3 up, but enough to get tiled and have the fixtures installed.  The floor is ready for tile.  I need to paint on the waterproofing membrane, and then tile away!  I'd love to finish enough of the tile to have the fixtures installed before vacation, but that might be a little aggressive even for me.  If I miss though, at least I'll be in a great spot for when we get back.

From here:

To here (actually a little further than depicted, that wall is covered and the seams have been taped):


No comments: